Home / 02
The night of 26 April 1986
What test was being run, what happened minute by minute and why reactor 4 exploded.
Summary
- A safety test was being run: to see whether the turbine, while slowing down, could power the cooling pumps until the diesel generators started. SupportedSourcesThe sources for this point are in the detail section of the page.
- The power fell far below what was planned (to about 30 MWt, about 1%) and then held at about 200 MWt, with very few control rods inside the core. SupportedSourcesThe sources for this point are in the detail section of the page.
- At 01:23:40 the emergency shutdown (AZ-5) was pressed. Seconds later the power shot up. SupportedSourcesThe sources for this point are in the detail section of the page.
- At 01:23 there were two explosions, 2 or 3 seconds apart. They destroyed the core and the roof of the building. SupportedSourcesThe sources for this point are in the detail section of the page.
- Two workers died that night. In total, between 30 and 31 people died in the first weeks and months. Sources differSourcesThe sources for this point are in the detail section of the page.
In detail
The test
- The test was meant to find out whether the turbine, as it slowed down, could feed the cooling pumps until the emergency diesels started, in case the plant lost power. SupportedSources[92] Nuclear Energy Agency (2002) (NEA, 2002)
- It was carried out without coordination between the test team and the nuclear safety staff. SupportedSources[92] Nuclear Energy Agency (2002) (NEA, 2002)
- During the test the emergency core cooling system was disconnected. SupportedSources[92] Nuclear Energy Agency (2002) (NEA, 2002) INSAG-7 explains that the chief engineer could authorize this and that the authorization was an approved part of the procedure; it did not cause the accident, but INSAG-7 considers that running for about 11 hours at half power with that system blocked was a sign of a lack of safety culture. SupportedSources[49] International Nuclear Safety Advisory Group (1992) (INSAG, 1992)
Timeline
- 25 Apr, ~23:00 The Kyiv grid dispatcher allows the power to be reduced further. SupportedSources[92] Nuclear Energy Agency (2002)[43] Higginbotham (2019) (NEA, 2002) Higginbotham (2019) says the test could not start before 21:00. Sources differSources[92] Nuclear Energy Agency (2002)[43] Higginbotham (2019)
- Afterwards The power was supposed to settle at about 1,000 MWt, but it drops to about 30 MWt. SupportedSources[92] Nuclear Energy Agency (2002) (NEA, 2002)
- 26 Apr, ~01:00 The power stabilizes at about 200 MWt, with only 6 to 8 control rods in the core. The minimum was 30 according to the NEA and 15 according to Dyatlov. Many rods had been withdrawn to compensate for xenon. Sources differSources[92] Nuclear Energy Agency (2002)[31] Dyatlov (1995) (NEA, 2002; Dyatlov, 1995)
- 01:23:04 The test begins: the steam valve to turbine 8 is closed. SupportedSources[49] International Nuclear Safety Advisory Group (1992) (INSAG, 1992)
- 01:23:40 The emergency shutdown button (AZ-5) is pressed. SupportedSources[49] International Nuclear Safety Advisory Group (1992) (INSAG, 1992)
- 01:23:43 Signal of a rapid power increase. SupportedSources[49] International Nuclear Safety Advisory Group (1992) (INSAG, 1992)
- 01:23:49 Signal of a fuel channel rupture. SupportedSources[49] International Nuclear Safety Advisory Group (1992) (INSAG, 1992)
- 01:24 The chief control engineer's log records: "strong shocks; the rods stopped before reaching the bottom". SupportedSources[49] International Nuclear Safety Advisory Group (1992) (INSAG, 1992)
The seconds come from the INSAG-7 appendix, which admits that the exact moment is uncertain and that the times may vary somewhat.
What these figures mean
MWt = thermal megawatts, the heat the reactor produces. Rated power: 3,200 MWt. So 1,000 MWt is about a third of rated power, 200 MWt about 6% and 30 MWt about 1%. All of them are far below 20%, the level at which the reactor became unstable (NEA, 2002). The percentages are this site's own calculation.
Who decided to continue at 200 MWt
The sources disagree. Sources differSources[31] Dyatlov (1995)[43] Higginbotham (2019)[92] Nuclear Energy Agency (2002)[49] International Nuclear Safety Advisory Group (1992) (Dyatlov, 1995; Higginbotham, 2019; NEA, 2002; INSAG, 1992)
- Dyatlov (Dyatlov, 1995), who was running the test, writes that Akimov proposed limiting the power to 200 MW instead of 700 MW and that he agreed. This is an interested source: Dyatlov was convicted.
- Higginbotham (2019) says Dyatlov insisted on 200 MW, that Akimov objected (the programme called for no less than 700 MW) and that he finally gave in.
- The NEA (2002) attributes the drop in power to an operating error.
- INSAG-7 (INSAG, 1992, section 5.1) says recent reports suggest there was no operator error as such: the Soviet commission speaks of an unknown cause and of the impossibility of controlling the power.
INSAG-7 also explains that operating below 700 MW was not prohibited by any regulation. The 700 MW limit given in the first report (INSAG-1, 1986) was based on verbal statements by Soviet experts. SupportedSources[49] International Nuclear Safety Advisory Group (1992) (INSAG, 1992)
The explosions
- At 01:23 on Saturday 26 April 1986 there were two explosions, 2 or 3 seconds apart, which destroyed the core of reactor 4 and the roof of the building. SupportedSources[92] Nuclear Energy Agency (2002) (NEA, 2002)
- The power peak is estimated at about 100 times rated power. SupportedSources[92] Nuclear Energy Agency (2002) (NEA, 2002)
- What caused each explosion is not known for certain. The NEA (2002) puts forward the hypothesis that the first was a steam and hot fuel explosion, and that hydrogen may have played a part in the second. INSAG-7 says that steam voids and the insertion of fully withdrawn rods probably added together. SupportedSources[92] Nuclear Energy Agency (2002)
- Legasov estimated the explosion at 3 to 4 tonnes of TNT and said that, at most, one can speak of up to 10 tonnes. SupportedSources[71] Legasov (n.d.) (Legasov, n.d., pp. 5 and 61)
Show quote · Legasov (n.d.), cassette 4, p. 61
Вот 3-4, или назвать в пределах до 10 тонн тринитротолуола вот максимум, что можно называть.
Legasov (n.d.), cassette 4, p. 61
- About 600 workers were on site that night. SupportedSources[118] United Nations Scientific Committee on the Effects of Atomic Radiation (2008) (UNSCEAR, 2008, Annex D)
The deaths
- That night and that morning: according to the NEA (2002), two people died immediately (one from the explosion and one from a coronary thrombosis) and a third died that morning from burns. SupportedSources[92] Nuclear Energy Agency (2002) One of them, Valery Khodemchuk, was buried under the rubble and his body was never recovered (see The people).
- In the following weeks: 28 died of acute radiation syndrome in the treatment centres. SupportedSources[92] Nuclear Energy Agency (2002)[118] United Nations Scientific Committee on the Effects of Atomic Radiation (2008)[47] International Atomic Energy Agency (n.d.-a) (NEA, 2002; UNSCEAR, 2008, Annex D; IAEA, n.d.-a)
- Total: 31 according to the NEA (2002) and Higginbotham (2019), which is the official Soviet figure announced by Dr Guskova in September 1986. UNSCEAR (2008) counts 30: 2 immediate deaths plus 28 from acute radiation syndrome. Sources differSources[92] Nuclear Energy Agency (2002)[43] Higginbotham (2019)[118] United Nations Scientific Committee on the Effects of Atomic Radiation (2008) This site shows the range: 30 to 31.
- Acute radiation syndrome: 237 workers were examined on suspicion of it and it was confirmed in 134, with doses of 0.8 to 16 Gy. Another 19 of those survivors died between 1987 and 2006 from various causes, not necessarily radiation. SupportedSources[118] United Nations Scientific Committee on the Effects of Atomic Radiation (2008) (UNSCEAR, 2008, Annex D)
Long-term death figures are in Consequences.